Return to Blog List

Gu Yue Long Shan Factory

Blog Image 1

For the Guyue Longshan project, since there were many units and there was ample time at the time, I temporarily decided to use Revit for modeling and drawing. Since the interior was not complicated, it was mainly the windows on the facade and wall finishes of different materials. It was a project that was completed relatively quickly in the initial stage of design phase.

The complexity of the model is related to the volume of the unit, but it is mainly the detailed requirements of the model that determine the final complexity and the time and effort required.

Return to Blog List